Wednesday, August 12, 2009







Today (Wednesday) we got the 41 jacked up and put on roller casters to raise it up enough for damaged crossmember clearance to get on the four post lift at the shop to assess the damage. It was not as bad as I thought. When I saw the rear mount cushion was ripped apart and the bolts were not pulled out of the transmission case, I was REALLY relieved! The entire original crossmember was totally destroyed when it hit that pipe sticking out of the street in Madison. We had to jack up the transmission and block it up to the correct height to take the stress off the front motor mounts, since that was the only thing left holding the entire engine and transmission in the car. Once that was done, we were able to start grinding off all the rivets holding the trans crossmember to the frame. It came out as three mangled pieces of metal. As it bent rearward on impact, it tore most of the overdrive wiring harness apart, along with bending the brake lines that cross over to the right side of the car along the crossmember from the master cylinder. Some of the brake lines are going to need replacing and then the system will need to be bled, but that is going to be the last thing on the repair agenda to keep the brake fluid from dripping all over during the rest of the repair operations. We began to fab up a new crossmember center section today,and I bought a new rear mount cushion to attach it to. Tomorrow we can start building the right and left side sections to attach (weld) to the frame rails, and they will in turn bolt together to the new center section. All these parts we are making out of rectangular steel tubing and 1/4" plate. Very time consuming, but it should still take less time than running all over God's creation trying to find another 41 -48 Chev to get another crossmember out of, then trying to modify it, and then reattach it to the frame. Four of us were on it in the shop today, beginning about 9:30 this morning, with three of our guys in the shop on it all day. We still have a lot of hours to put into it to get it back on the road, but it's gotta be done. It's not like a new car where you can just go out and buy new replacement parts... Hopefully, by the end of the work day tomorrow, we should have it pretty well wrapped up. This is definitely not something I wanted to have to do upon returning from vacation. There's enough catching up to do at work the way it is... I didn't NEED this to interfere with it. Hopefully more good progress tomorrow. Will keep posting until it's done. Thanks to Lee Russell for driving all the way down from Eveleth Tuesday morning to pick us up with his trailer. He got up at 2 am to drive down and was in Madison and we were loading up the car in the trailer by 10 am; back on the road by 10:30. Then he drove us all the way back home and we were unloading the car in my shop by shortly after 6:30 pm. Will post tomorrow's progress later.

No comments: